Specific Procurement Notice
Employer: Energy Development Corporation Limited (EDCL)
Project: Accelerating Sustainable and Clean Energy Transformation (ASCENT)
Funder: World Bank and Asia Infrastrusture Investment Bank
Contract title: Engineering, Supply, Erection and Commissioning for 56km, 220kV Double Circuit Transmission Line Bwishyura-Kigoma
Country: Rwanda
Credit No.: 7461 & 7460
RFP No: RW-REG/EDCL-425319-CW-RFP
a) Bidders must have successfully completed at least two (2) similar plant design supply and installation works done within the last five (5) years of similar nature and complexity, each with a value of at least USD 13.6Million.
b)Minimum average annual turnover of US$19.5million, calculated as total certified payments received for contracts in progress or completed, within the last three (3) years.
c) Additional qualification details are provided in the Bidding Documents.
Energy Development Corporation Ltd
Félix GAKUBA, Managing Director
KN2 ST 3, Nyarugenge District, Kigali City,
P.O. Box 3855 Kigali, Rwanda;Tel.: (250) 787172265,
Kigali City Tower (KCT), 2nd Floor, Procurement Office
Website: www.reg.rw
Sincerely.
|
Gentille UMUSHASHI Head Procurement Management Services |
Félix GAKUBA Managing Director |